We assume all the responsibilities that our practice materials may bring. They are a bunch of courteous staff waiting for offering help 24/7. You can definitely contact them when getting any questions related with our C_TS422_2023 practice materials. If you haplessly fail the exam, we treat it as our responsibility then give you full refund and get other version of practice material for free. That is why we win a great deal of customers around the world. Especially for those time-sensitive and busy candidates, all three versions of C_TS422_2023 practice materials can be chosen based on your preference. Such as app version, you can learn it using your phone everywhere without the limitation of place or time.

SAP C_TS422_2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Introduction to SAP S
  • 4HANA Production Planning: This section covers an overview of production planning components, functions, and planning approaches. Exploration of emerging trends.
Topic 2
  • Advanced Planning in SAP S
  • 4HANA: This section includes an overview of advanced planning fundamentals and master data. Explanation of key tools and processes. Discussion of planning evaluation concepts.
Topic 3
  • Master Data in SAP S
  • 4HANA: This section covers the exploration of crucial production-related master data elements, with emphasis on bill of material, routing, and production version.
Topic 4
  • Material Requirements Planning in SAP S
  • 4HANA: This part of the exam covers an examination of planning strategies, tools, and long-term planning concepts. Overview of MRP fundamentals and lot size procedures.
Topic 5
  • Managing Clean Core: This section covers the application of clean core principles to enhance business process agility, reduce adaptation efforts, and drive innovation in ERP systems.
Topic 6
  • Introduction to SAP S
  • 4HANA Supply Chain Planning: This part covers the background and motivation for SAP S
  • 4HANA, its main components, business applications, and user experience strategy.

>> New C_TS422_2023 Test Syllabus <<

SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing latest braindumps & C_TS422_2023 sure pass torrent & SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing free exam pdf

C_TS422_2023 certification exam is a very import component SAP certification exam. But passing SAP certification C_TS422_2023 exam is not so simple. In order to give to relieve pressure and save time and effort for candidates who take a preparation for the C_TS422_2023 Certification Exam, Test4Engine specially produce a variety of training tools. So you can choose an appropriate quick training from Test4Engine to pass the exam.

SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Sample Questions (Q81-Q86):

NEW QUESTION # 81
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. Quantity
  • B. Scrap percentage
  • C. Installation point
  • D. Item type

Answer: A,B

Explanation:
The subitems of a bill of material (BOM) are the components that make up the product or assembly. You can maintain the following data for each subitem:
Quantity: This is the number of units of the component that are required for one unit of the product or assembly. You can specify the quantity in different units of measure, such as base unit, order unit, or alternative unit. You can also use variable quantities, such as percentages or formulas, to calculate the quantity dynamically based on the product or assembly characteristics.
Scrap percentage: This is the percentage of the component that is expected to be wasted or lost during the production or assembly process. You can specify the scrap percentage for each component to adjust the quantity accordingly. For example, if the quantity of a component is 10 and the scrap percentage is 5%, the system will increase the quantity by 0.5 to account for the scrap.
The installation point (A) and the item type (B) are not data that you can maintain in the subitems of a BOM. The installation point is a field in the equipment master record that indicates where the equipment is installed. The item type is a field in the sales document item that determines the processing and pricing of the item. These fields are not relevant for the BOM subitems. Reference:
https://sapstack.com/pp/bom-in-sap-bill-of-material/
https://skillstek.com/bill-of-material-in-sap/


NEW QUESTION # 82
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

  • A. The MRP run does NOT consider the material; it has to be planned interactivelty
  • B. The MRP run assumes in-house production.
  • C. The MRP run assumes external procurement.
  • D. The MRP run plans the material only if a quotation has been maintained.

Answer: A

Explanation:
If you have created a new MRP-relevant material that supports both in-house production and external procurement, you need to specify the procurement type for the material in the material master record. The procurement type determines how the material is procured, either in-house, externally, or both. If you do not specify the procurement type, the MRP run does not consider the material, and it has to be planned interactively using the MRP Live app or the MD04 transaction. In interactive planning, you can manually assign a procurement type to the material and create the corresponding order proposals, such as planned orders or purchase requisitions. Alternatively, you can maintain a production version for the material, which defines the procurement type and the BOM and routing to be used for in-house production or external procurement. The production version can be assigned to the material in the material master record or in the MRP Live app or the MD04 transaction. The production version allows the MRP run to plan the material automatically based on the specified procurement type123. Reference: Procurement Type | SAP Help Portal, Production Version | SAP Help Portal, Material Requirements Planning with SAP S/4HANA, page 79-80.


NEW QUESTION # 83
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

  • A. Recipe approval
  • B. Approved resources
  • C. Batch record
  • D. Digital signature
  • E. GMPcompliant flag

Answer: A,C,D


NEW QUESTION # 84
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Setup time
  • B. Pick/pack time
  • C. Move Time
  • D. Queue time
  • E. Float before production

Answer: A,C,D

Explanation:
A routing operation is a step in the production process that defines the work center, the duration, and the sequence of the operation. A routing operation consists of several time elements that are used to calculate the operation start and finish dates, as well as the capacity requirements. The time elements that are part of a routing operation are:
Move time: The time required to move the material from one work center to another, or from the storage location to the work center.
Setup time: The time required to prepare the work center for the operation, such as changing tools, adjusting machines, or cleaning the work area.
Processing time: The time required to perform the operation, such as machining, assembling, or testing the product.
Teardown time: The time required to restore the work center to its original state after the operation, such as removing tools, resetting machines, or disposing of waste.
Queue time: The time that the material waits at the work center before the operation starts, due to the work center being occupied by another operation or having a fixed start date.
The pick/pack time and the float before production are not part of a routing operation. The pick/pack time is the time required to pick the material from the storage location and pack it for delivery, which is usually part of the outbound logistics process. The float before production is the time buffer before the scheduled start date of the production order, which can be used to compensate for delays or changes in the production plan.


NEW QUESTION # 85
You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?

  • A. Assembly processing with production orders (82)
  • B. Planning at assembly level (70)
  • C. Planning with final assembly (40)
  • D. Production by lot size (30)

Answer: B


NEW QUESTION # 86
......

Prepare for the SAP C_TS422_2023 exam with ease using Test4Engine SAP C_TS422_2023 exam questions in a convenient PDF format. Our PDF files can be easily downloaded and accessed on various devices, including PCs, laptops, Macs, tablets, and smartphones. With the SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing (C_TS422_2023) PDF questions, you have the flexibility to study anytime and anywhere, eliminating the need for additional classes. Our comprehensive PDF guide contains all the essential information required to pass the C_TS422_2023 in one shot.